Teaching GuideTerm
Higher Technical University College of Nautical Science and Naval Engines
  Home | galego | castellano | english | A A |  
Mestrado Universitario en Enxeñaría Mariña
 Subjects
  Operation and Design of LNGs
   Contents
Topic Sub-topic
CAP.1- LIQUEFIED NATURAL GAS AND PROPERTIES - Introduction.
- Processing of Liquefied Natural Gas
- Design and Containment of cargo
CAP.2- SYSTEM OF LINES RELATED TO THE CARGO - Liquid Line.
- Vapour Line.
- Reaching/cooling line.
- Inert Gas Line.
- Gas line to the machine.
- Venting line.
- Supports, insulation and joints of the load lines.
CAP.3- EQUIPMENT OF CARGO TANKS. - General description.
- Cargo Tank Pumps.

CAP.4- GAS PLANT EQUIPMENT - Low Duty Compressors.
- High Duty Compressors.
- Gas Seal System.
- Lubrication system.
- Natural Gas Steam Flow Control System.
- Low Performance Compressors.
- Methane heaters.
- LNG vaporizer.
- LNG Forcing Vaporizer.
- Steam separator.
- Nitrogen Production System.
- Inert Gas/Dry Air Plant.
- Valve system.

CAP.5- CARGO CONTROL ROOM AND ENGINE CONTROL ROOM - General description.
- Description of the I.A.S Integrated Automatic System.
- Gas Management and Control System.
- Fixed Gas Detection Systems.
- Tunnel of Boil-off Pipes in the Machine.
- Emergency Stop System (ESD) and Protection of Cargo Tanks.
- Ballast System.
CAP.6-AUXILIARY SYSTEMS RELATED TO CARGO AND DECK - General description.
- Nitrogen Pressurization and Control System of the Primary and Secondary Isolation Spaces.
- System for Measuring the Level of Liquefied Natural Gas in Cargo Tanks.
- Cofferdams Heating System.

CAP.7- OPERATIONS RELATED TO CARGO Pressurization of Primary and Secondary Isolation Spaces.
Operation after a Dock Stay.
- Initial Insulation Space Inerting
- Drying of cargo tanks.
- Inerting cargo tanks.
- Gassing-up Cargo Tanks.
- Cooling down Cargo Tanks.
Operations Prior to the Entry of the Vessel in Dock.
- Warming up Cargo Tanks.
- Inert Cargo Tanks.
- Aerating
CAP. 8-STEAM GENERATOR - Operation and control modes
CAP.9-RELIQUEFACTION - Introduction and generalities
- Boi-Off and its management
- Reliquefaction plants operating with Brayton Cycle
- Boil off cycle and N2 cycle
- Principles of regulation and control.
- Equipment
- Installations implemented on board
- Reliquefaction plants operating with cascade Rankine cycles
- Reliquefaction plants operating with Rankine cycles in cascade with mixed refrigerant.
- Other reliquefaction plants
- Facilities plans

Universidade da Coruña - Rúa Maestranza 9, 15001 A Coruña - Tel. +34 981 16 70 00  Soporte Guías Docentes